Friday, June 20, 2008

WIPs like coffee


WIPs like coffee
Originally uploaded by ShelbyD
And so do I. Iced and blended, considering it will top 100 again today. Blergh. This afternoon I will take advantage of the air conditioning at the theater when I take Pumpkin to see Kung Fu Panda. I will be bringing the other half of the pictured WIP (a bag I am designing) to the movies.

Tonight at 9:01(12:01 Eastern), the Summer of Socks begins! I'm getting my ball winder out right now to get some yarn cakes ready. I'm planning some purless Monkeys for my first pair.

Wednesday, June 18, 2008

Ah, vacation


Ah, vacation
Originally uploaded by ShelbyD
Today is the first day of a mini-sabbatical - I am off work until July 14th. Since there wasn't much chance to take time off over the last few years, I have a bit of a surplus of paid time off. I am tacking on a bit of time before and after the corporate week-long holiday to enjoy a nice long break. More crazy work times are coming up, and I really like my job, but for the next three and a half weeks I am gleefully out of the office.

Pictured WIP: Seamless Saarjte's Booties

Thursday, June 12, 2008

Violet Dress Pattern

photo.jpg

This seamless dress is worked from the top down, with garter stitch straps and hem, and decorative eyelet increases at the center front and back.

Size: 2T

Materials:
Berroco Comfort DK (50 grams,178 yards), 3 skeins (about 450 yards)
16” circular needle, size 8 (or size needed to obtain gauge)
24” circular needle, size 8 (or size needed to obtain gauge)
8 stitch markers


Gauge: 22 stitches = 4 inches in stockinette stitch

Pattern notes:
PM – place marker
Kfb – knit into front and back of next stitch
M1 – with the tip of your right needle, knit the bar in between the last stitch on your right needle and the first stitch on the left needle. This increases one stitch and leaves a decorative eyelet.
SlM – slip marker
K – Knit
BO – Bind off

Pattern:

Neck and straps are worked in the round, in garter stitch.
Cast on 80 stitches to shorter circular needle. Join to work in the round, placing marker to note beginning of round.

Round 1 and all odd rows: Purl
Round 2: Knit
Round 4: *K19, kfb*, repeat 3 times
Round 6: Knit
Round 8: K9, *kfb, k20* three times, kfb, K10
Round 10: Remove marker. BO 12, k32, BO 12, k32

You have divided the work to form the straps and have active stitches for the front and back pieces.

Front: At this point you will work back and forth. Turn the work to begin on a wrong side row.

Row 1 (WS): Purl across (32 stitches)
Row 2 (RS): K16, place marker, K16
Row 3: Purl
Row 4: Knit
Row 5: Purl
Row 6: Knit to one stitch before marker, M1, K1, SlM, K1, M1, knit to end of row
Row 7: Purl

Repeat Rows 6 and 7 nine times more. Do not bind off. Break yarn, leaving an 8 inch tail. Front stitches will rest while back is worked.

Back: Attach yarn to the WS side of the back piece and work as for front. Do not break yarn.

At this point you will rejoin the pieces as follows: On the next right side row, knit across back stitches, PM to mark underarm, then knit across the resting front stitches. PM to denote beginning of round, and join underarm by knitting the next stitch.

The rest of the piece will be worked in the round. Work in stockinette stitch, knitting every round, until piece measures 2 inches from underarm or desired length of bodice.

Skirt: At this point you should have markers in the center of the front and back, and at the center of each underarm. Place additional markers to note skirt increase points at the center point in between the existing markers as follows. *SlM, k13, PM, knit to next marker*, repeat to end of round.

You should end up with 8 equidistant markers around the skirt. You will be increasing before and after each marker.

Round 1: SlM, *kfb, knit to last stitch before marker, kfb, SlM*, repeat to end of round
Round 2-6: Knit

Repeat rounds 1-6 eight times more, switching to longer circular needle when required to hold larger number of stitches. At this point, you can remove increase point and center point markers if desired, leaving beginning of round marker in place. Continue in stockinette stitch until skirt is 11 inches from beginning of increase round, or 1 inch shorted than desired length.

Work garter stitch hem as follows:

Round 1,3,5,7,9: Purl
Round 2,4,6,8: Knit
Round 10: Bind off all stitches.

Finishing: Break yarn. Weave in ends. Block if desired.

photo.jpg